The Jerusalem Post · General

Gush Dan metro could operate on Shabbat as driverless trains may cut NIS 150m. in annual costs

· By UDI ETZION
Story summary

The planned Gush Dan metro trains will be highly automated, driverless, and run every minute and a half, even during peak hours.

Read at The Jerusalem Post

Opens the original publisher in a new tab. Full articles belong to their publishers; a subscription may be required.

Your local edition.

Choose a timezone for story timestamps and date filters.