The Age · National / NSW

Fixes finally in sight for road choke points on Sydney’s northern beaches

· By Matt O'Sullivan
Story summary

Major construction to remove a choke point on a key arterial route to Sydney’s northern beaches could start as early as mid-2027 – about a year earlier than previously planned – as a wide-ranging review sparks calls for plans for the multibillion-dollar Beaches Link motorway tunnel to be revived.

Read at The Age

Opens the original publisher in a new tab. Full articles belong to their publishers; a subscription may be required.

Your local edition.

Choose a timezone for story timestamps and date filters.