Contractor warned to ‘step up’ and finish Sydney’s maligned M6 motorway or face the consequences
Story summaryTwin tunnels should be open but lead contractor wants out, blaming sinkholes and a ‘reverse fault’. The NSW government insists ‘there is a technical solution available’
Read at Guardian AustraliaOpens the original publisher in a new tab. Full articles belong to their publishers; a subscription may be required.