The $1.7 billion booby trap in latest Suburban Rail Loop contract
Story summaryThe cost of scrapping the Suburban Rail Loop has risen by $1.7 billion after the Victorian government signed a contract to run and maintain the eastern section of the train line – when it opens in 2035.
Read at The AgeOpens the original publisher in a new tab. Full articles belong to their publishers; a subscription may be required.